Navy awards contract for new on-board air traffic radar | thebaynet.com | TheBayNet.com

0

NAVAL AIR SYSTEMS COMMAND, RIVIÈRE PATUXENT, Md. – The US Navy awarded a $ 25 million contract to Saab Inc. on September 25, 2020, for two AN / SPN-50 (V) 1 onboard air traffic radars and an installation and control kit.

The new fixed price incentive fee contract is a sole source purchase with the first AN / SPN-50 (V) 1 scheduled for delivery in September 2021. It will replace the Navy’s current radar system, AN / SPN- 43C, on Nimitz-class aircraft carrier and amphibious assault ships during exercise 2021.

“The SPN-50 brings new capabilities to the fighter, allowing aircraft carriers and amphibious assault ships to operate in any current and future environment,” said Captain Kevin Watkins, the office’s program manager. of the Naval Air Traffic Management Systems Program (PMA-213). “The SPN-43C has been in service since the mid-1960s, and although it has been updated along the way to fight and win today, the performance and technology updates brought by the SPN-50 will ensure that the Navy and Marine Corps have a relevant, sustainable ability to fight and win in the future.

Some of the improvements made by the new digital radar system and modern radar processing are improved detection and tracking of targets in the presence of competing clutter, as well as the resolution of the increased spectrum constraints currently encountered with AN / SPN-43C and other existing radar systems.

The AN / SPN-50 (V) 1 was first shown in October 2019 at Naval Air Warfare Center Aircraft Division Webster Field in St. Inigoes, Maryland, and has since performed numerous tests and evaluations at various locations throughout the engineering and manufacturing course. phase.

The two AN / SPN-50 (V) 1s should be installed on the aircraft carrier USS Dwight D. Eisenhower (CVN-69), for operational tests, and on the future amphibious assault ship Bougainville (LHA-8) , which is currently under construction.

The AN / SPN-50 (V) 1 is expected to reach initial operational capability at the end of 2022.

Twenty-five air traffic radars on board AN / SPN-50 ships are expected to be purchased through FY 2028.

PMA-213 oversees the procurement, development and commissioning of the AN / SPN-50 (V) 1.


Source link

Leave A Reply

Your email address will not be published.